The pile must be overloaded by a minimum of 50% of its Operating load and held for twenty-four hrs. This provides a Verify on the last word bearing capability from the pile together with the workmanship involved in forming the pile.We are outstanding at what we do, and we pride ourselves in professionalism and integrity. Send an e-mail now to facts